Repairs to the foundation commenced on April 3, 2017.


The work done on the first day is shown in this video.

A few days later the site had dried enough to allow continuation of the work.


A drain was installed to prevent future accumulations of water.


A form was built. The drain pipe that runs to the sump can be seen.


The form was filled with concrete. A temporary sump pump keeps the site drained.


After the concrete dried, hydraulic jacks raise the sagging wall a small amount each day.